Re: 9n5370 drawbar stay safety chain

[ Follow Ups ] [ Post Followup ] [ N Board Forum ] [ FAQ ]

Posted by Tim Daley(MI) on August 08, 2018 at 11:22:50 [URL] [DELETE] :

In Reply to: Re: 9n5370 drawbar stay safety chain posted by Dud on August 08, 2018 at 09:08:45:

Nothing on installation. The F-04 manual has the exploded parts view detailing all the 3-pt lift parts but doesn't really show an assembly. Ditto for all the MPC's as well. Part descriptions as: 9N-5370 -chain and wedge assembly; 9N-5374 -STAY,(drawbar) Upper; and 9N-5375 -STAY (drawbar)Lower, and all the required hardware. No 8N Operator's Manual has a picture assembly either. Only a short two or three sentence mention of the lock-out with stays, but no details on how to. Perhaps with POSITION CONTROL they deemed they were not in high demand. Now, there are several Dearborn Implements that detail them on setup and usage. See the LINK from our MANUALS forum for the Dearborn-Peoria Grain Drill as it has them noted in the chapter on hitching to the 8N.

Tim Daley(MI)


Follow Ups:


Post a Followup:
Name   : 
E-Mail : 
Subject: 
Message: To add a single image to your post, click here. To add multiple images to your post, click here. Optional Link URL : http://www.yourwebsite.com Link Title : Website Title Optional Image URL: http://www.myimages.com/mypic.jpg
Enter image characters into the text box.

Press Preview Message button below to proofread message & check if images and/or links are shown before posting message. Press
browser's back button if correction is needed. Press Post Message button on Preview Message page to finalized your post. Thanks!
  
   

[ Follow Ups ] [ Post Followup ] [ N Board Forum ] [ FAQ ]